Midway-Waterton Transmission Project

Transmission line maps

The Midway-Waterton project includes approximately 73 miles of rebuilt 345 kV transmission line that was completed in 2008 and about nine miles of existing line between the Daniels Park and the Waterton substations that has been rebuilt to 345 kV (work completed in May 2011). The two rebuild projects are within existing transmission line right-of-way. The below detailed aerial maps show the location of the transmission lines.

View All Sheets
(17.8 MB PDF)
Illustrated map of the Pawnee to Midway Waterton Transmission line